An older Schwing S 36 X truck-mounted boom pump arrived at Schwing Stetter India's factory in Tamil Nadu on a trailer, with its paint gone, its hopper caked in concrete and its steel rusting. It left on its own wheels in Schwing green. The new nameplate records the refurbishment as August 2024.

Not every buyer needs a new boom pump. For a contractor who wants a Schwing machine at a lower outlay than new, a factory-refurbished unit is the other route. The factory photographed this one before and after, one assembly at a time, and that record shows what the buyer of a refurbished pump is paying for.

S 36 Xtruck-mounted boom pump
08/2024refurbishment date on the nameplate
10assemblies shown before and after
Factorydone at Schwing Stetter India
BeforeWorn Schwing S 36 X boom pump on a trailer at night before refurbishment
As it arrived, on a trailer.
AfterRefurbished Schwing S 36 X boom pump in green, parked in the factory
After refurbishment, in the factory.

Where a refurbished pump makes sense

  • A first boom pump for a contractor moving up from line pumping.
  • A second unit to cover busy periods, where a new machine would sit idle part of the year.
  • A fixed equipment budget that a new machine would not fit.

The trade-off is plain: it is an older machine. What decides its value is how much of it was renewed, and whether that was tested. The rest of this article goes through both.

Structure first: the subframe

The subframe carries the boom and the outriggers, so it was dealt with before anything was bolted back on. It was lifted off, shot blasted and primed. The record also shows corroded subframe parts replaced with newly fabricated ones.

BeforeOld boom pump subframe lifted by crane before shot blasting
The subframe lifted off for shot blasting.
AfterBoom pump subframe after shot blasting and priming
The same subframe, blasted and primed.

The hopper

The hopper came in buried under hardened concrete. It went out clean and repainted, with its grate in place.

BeforeConcrete pump hopper covered in hardened concrete before refurbishment
Hopper on arrival.
AfterClean, repainted concrete pump hopper with grate after refurbishment
Hopper after refurbishment.

A newer control system

This is the change an operator notices first. The machine arrived with Schwing's Vector control and its single-color display. It left with a Boom Control System and a color screen that shows pumping rate, alarms, operating data and diagnostics.

BeforeSchwing Vector control panel with monochrome display
Vector control, single-color display.
AfterSchwing Boom Control System color display showing gauges and status
Boom Control System, color display.

The boom control block, the valve block that moves each boom section, was replaced with a new one.

BeforeOld boom control valve block before replacement
Boom control block on arrival.
AfterNew boom control valve block after replacement
New boom control block fitted.

Outriggers, operating box and water system

The rest of the machine was taken through the same treatment. The local operating box was rebuilt with new pressure gauges, and the water tanks were replaced.

BeforeCorroded outrigger leg before refurbishment
Outrigger leg on arrival.
AfterRepainted outrigger leg after refurbishment
Outrigger leg after refurbishment.
BeforeCorroded manual control box before refurbishment
Manual operating box on arrival.
AfterRebuilt manual control box with two new pressure gauges
Operating box with new gauges.
BeforeOld corroded water tank before refurbishment
Water tank on arrival.
AfterNew black water tanks fitted after refurbishment
New water tanks fitted.

Drive and boom safety valves

The PTO gearbox, which takes power from the truck to the pump hydraulics, is shown before and after. So are the holding valves on the boom cylinders, the valves that keep a boom section in place if a hose fails.

BeforePTO gearbox area before refurbishment
PTO gearbox on arrival.
AfterPTO gearbox area after refurbishment
PTO gearbox after refurbishment.
BeforeRusted boom cylinder holding valve before refurbishment
Boom cylinder holding valve on arrival.
AfterBoom cylinder holding valve after refurbishment
Holding valve after refurbishment.

Reconditioning and testing

Two steps do not show in a walk-around photo. Boom cylinders are reconditioned as sub-assemblies and pressure tested. Then the boom is tested to Schwing's standard: each section and the slewing are timed, pressures are checked against a set-point sheet, and the sheet is signed by the tester and by quality control.

Why the test sheet matters. New paint tells you nothing about how a boom moves. A signed sheet of timings and pressures does.

What the buyer gets

AssemblyWhat was done
SubframeShot blasted and primed; corroded parts newly fabricated
HopperCleaned of hardened concrete, repainted, grate in place
Control systemVector control replaced by Boom Control System with color display
Boom control blockReplaced with a new block
OutriggersRefurbished and repainted
Manual operating boxRebuilt, with new pressure gauges
Water pump and tanksPump refurbished; tanks replaced
PTO gearboxShown before and after
Boom cylindersReconditioned and pressure tested; holding valves shown before and after
Whole boomTimed and pressure checked against a set-point sheet
DispatchRefurbished Schwing S 36 X boom pump ready for dispatch, left front view
Ready for dispatch, left side.
DispatchRefurbished Schwing S 36 X boom pump ready for dispatch, right front view
Ready for dispatch, right side.

Six questions to ask about any refurbished boom pump

  • Was the subframe stripped and blasted, or painted over?
  • Which control system does it have now, and can it still be supported with parts?
  • Were the boom cylinders and holding valves opened and tested, or only cleaned?
  • Is there a signed test sheet with boom timings and pressures?
  • Who did the work, and does a nameplate record it?
  • What warranty and parts support come with it?
Considering a refurbished Schwing boom pump? Tell us the boom reach and hourly output you need, and we will come back with factory-refurbished and new options side by side. Request a quotation, or see the Schwing boom pumps.
How the hydraulics of a concrete pump work
Flow, pressure, heat and the parts that handle them
Message usClose
Schwing Stetter PhilippinesChat with us on Messenger

Hello. Tell us which equipment or parts you need, and where your project is. We will reply on Messenger.

Opens Messenger with your message ready to send.