A placing boom stands on its own mast inside the building and is fed by a stationary pump on the ground. It reaches 28 to 35 m across the slab and climbs with the structure, floor by floor.

Request a quotationSee the models

When to use one

The jobs a truck-mounted pump cannot do

  • The site has no room or access for a truck-mounted boom pump
  • The structure is tall or complex, beyond the reach of a boom on a truck
  • The tower crane is needed for steel, formwork and materials, not for concrete
  • The program is tight and pours cannot wait their turn
What you gain

Crane time back, and a shorter schedule

  • The tower crane is free for other lifts while you pour
  • You can place concrete at any time, day or night
  • Faster floor cycles shorten the build schedule
  • The tower crane can come off hire earlier
Schwing separate placing boom on its octagonal tubular mast with working platform
How it works

One mast, one pipeline, the whole floor covered

The boom sits on an octagonal tubular mast that passes through openings in the floor slabs. A stationary pump at ground level pushes concrete up the delivery line to the boom, and the operator places it across the slab by radio remote or manual control.

  • It climbs by itself. The self-climbing system runs on the boom's own hydraulics and lifts the mast 500 mm per stroke, about 4 minutes for a 3 m floor.
  • No crane after installation. Once the boom is in, the tower crane is not needed for it again until the project is complete.
  • Freestanding at the start. The mast stands free up to 20 m high (14 m on the SPB 35) before it needs floor frames.
  • Faster to erect. The split boom option breaks the boom into lighter lifts for quicker, easier erection.
  • Standard pipeline. DN 125 line throughout, the same as your stationary pump.
See it work

A placing boom on site, from erection to pour

Models

Four mast-mounted booms, 28 to 35 m

ModelHorizontal reachPipelineEnd hoseBoom weightOptional counterweightMax. freestanding height
SPB 2828 mDN 1254 m6,600 kg6,000 kg20 m
SPB 3030 mDN 1254 m6,700 kg6,000 kg20 m
SPB 3232 mDN 1254 m7,060 kg6,000 kg20 m
SPB 3535 mDN 1254 m8,250 kg6,550 kg14 m

Figures are manufacturer data from Schwing Stetter India. All four models are available with the split boom option. Contact us to confirm the configuration for your project.

For slabs and low-rise work

RVH 18 concrete distributor

The RVH 18 is a placing boom that needs no mast. It stands on four self-supporting legs that fold for transport, and is moved from pour to pour. An electric motor drives it, and the operator works it from a hand-held remote with manual levers as backup.

Horizontal reach18.2 m
Vertical reach21 m
Slewing range360 degrees
Area covered254 m²
PipelineDN 125
End hose3 m
Power requirement10 kW
The complete set

Pair it with a Schwing stationary pump

A placing boom is only as good as the pump behind it. Schwing stationary pumps deliver the pressure a high-rise line needs, through the same DN 125 pipeline the boom carries.

See the stationary pumps

Schwing placing boom on a barge pouring a bridge pier, fed by a transit mixer

A placing boom working from a barge on a bridge project.

Schwing separate placing boom on its mast over a building foundation

A mast-mounted boom, fed by a stationary pump.

Planning a high-rise pour?

Tell us the building height, floor area and pour volume, and we will match the boom and the pump.

Message usClose
Schwing Stetter PhilippinesChat with us on Messenger

Hello. Tell us which equipment or parts you need, and where your project is. We will reply on Messenger.

Opens Messenger with your message ready to send.