Every Schwing stationary pump has two personalities. Connected one way it moves the most concrete per hour. Connected the other way it pushes the hardest. The spec sheet calls them rod side and piston side, and knowing which one a job needs is the difference between a pump that copes and one that stalls halfway up the building.

Two gears, one pump

The easiest way to picture it is a loaded truck. In top gear it covers ground quickly on a flat road, but it will not climb a steep ramp. In first gear it climbs the ramp, slowly. The engine is the same in both cases. The gear decides whether its power becomes speed or pulling force.

A concrete pump makes the same trade:

  • Rod side is top gear. The pump moves a lot of concrete quickly, but it cannot push it very high or very far.
  • Piston side is first gear. The pump pushes much harder, enough to send concrete up a tall building, but less concrete comes out each hour.
Rod side: top gearFast and easy. Lots of concrete, not far.Piston side: first gearSlow and strong. Less concrete, a long way up.
Same pump, same engine. Rod side sends more concrete a short way. Piston side sends less concrete much higher.
A pump can give you its highest output or its highest pressure, but never both at the same moment.

What that looks like on a real pump

Here are the two settings on an SP 2800 D, followed by what happens inside the pump to produce them.

101 m³/hrSP 2800 D on the rod side
119 barthe same pump on the piston side
33 vs 19strokes a minute, rod side vs piston side
1 pumpthe same engine and cylinders either way

In one line each

  • Rod side gives high output at lower pressure. Use it for large pours over short lines.
  • Piston side gives high pressure at lower output. Use it for height and distance.

Schwing prints the warning on every data sheet: maximum output and maximum pressure cannot be achieved at the same time. The rest of this article explains why.

What "rod side" and "piston side" mean

A concrete pump has two concrete cylinders. Each concrete piston is pushed by a hydraulic cylinder behind it. Inside that hydraulic cylinder is a piston on a rod, and the piston has two faces. One is the full, flat face. The other is the back of the piston, where the rod is attached, so the oil can only press on the ring of metal around the rod.

The two names simply say which face the oil from the hydraulic pump is pressing on.

Piston side: oil pushes on the full piston faceBigger area: more force, slower strokeconcrete outconcrete in
Piston side. Pump oil (dark blue) pushes the full face of one piston, which drives concrete out. Oil trapped between the two rod sides (light blue) pulls the other piston back to draw concrete in.
Rod side: oil pushes on the ring around the rodSmaller area: less force, faster strokeconcrete outconcrete in
Rod side. Pump oil (dark green) presses on the ring around the rod of the returning piston. Oil trapped behind the two full faces (light green) carries the push across to the piston that is driving concrete out.

The science: same oil, two areas

Three rules of hydraulics explain everything.

  1. ForceForce equals oil pressure times the area it presses on. The full face is bigger than the ring, so the same oil pressure gives more push on the piston side.
  2. SpeedThe hydraulic pump delivers a fixed flow of oil. The chamber on the rod side is smaller because the rod takes up room, so it fills faster and the piston moves faster.
  3. PowerThe engine has only so much power. Power is pressure times flow, so you can spend it on push or on speed, not both.

Take a hydraulic piston 120 mm across on an 80 mm rod. The ring around the rod is about 56 percent of the full face. Now look at the Schwing SP 2800 D: 66 bar on the rod side against 119 bar on the piston side. Sixty-six is 56 percent of 119. The pressure difference is the area difference.

Output101 m³/hrRod side58 m³/hrPiston sidePressure on concrete66 barRod side119 barPiston side
The Schwing SP 2800 D with 200 x 1,600 mm cylinders. Rod side: 101 m³/hr at up to 66 bar, 33 strokes a minute. Piston side: 58 m³/hr at up to 119 bar, 19 strokes a minute.
Multiply output by pressure and the two set-ups come out almost equal: 101 x 66 is 6,666, and 58 x 119 is 6,902. It is the same engine doing the same work. Only the trade between volume and push changes.

Rod side and piston side on the pumps we supply

These are the manufacturer's figures for each side. Output and pressure on the same side go together.

ModelRod sidePiston side
OutputPressureStrokes/minOutputPressureStrokes/min
SP 1200 D45 m³/hr70 bar24Rod side only
SP 1400 D52 m³/hr63 bar2434 m³/hr99 bar16
SP 1800 D73 m³/hr62 bar2442 m³/hr112 bar14
SP 180772 m³/hr62 bar2742 m³/hr112 bar16
SP 2509 D64 m³/hr79 bar2635 m³/hr142 bar14
SP 2800 D101 m³/hr66 bar3358 m³/hr119 bar19
SP 3000 D64 m³/hr86 bar2635 m³/hr156 bar15

The SP 1200 D is built as a rod-side pump, which suits the low and mid-rise work it is bought for. From the SP 1400 D upward, each pump can run on either side.

When the rod side matters

Rod side is the earning set-up. More strokes a minute means more cubic meters an hour, so transit mixers are emptied faster and a large pour finishes sooner.

  • Slabs, footings, mat foundations and other large pours close to the pump
  • Low and mid-rise work where the line is short
  • Any job where the limit is how fast the trucks arrive, not how hard the pump can push

When the piston side matters

Every meter of pipeline costs pressure, and height costs the most. As a rule of thumb, allow 20 bar to get the concrete moving, 0.25 bar for every meter of vertical rise and 1 bar for every 20 m of line, plus bends and the end hose. A pour 150 m up with 200 m of line already needs more than the 66 bar the SP 2800 D gives on the rod side. That is piston-side work.

  • High-rise buildings and tall piers
  • Long horizontal lines, such as tunnels and sites the pump cannot get close to
  • Stiff or harsh mixes that resist moving through the pipe

Our guide on sizing a stationary pump for your building height shows how to add up the pressure for your own job.

Before you change a pump over

  • Check the pipeline rating. Pipes, couplings and the end hose must all be rated for the higher pressure. A line that was safe at 66 bar is not automatically safe at 119.
  • Plan for lower output. On the piston side the same pump delivers a little over half the volume. Schedule the trucks to match.
  • Have a technician do it. The change is made at the hydraulic connections to the drive cylinders. It is a workshop job, not something to improvise on site.

How to read a pump specification

When a brochure gives one output and one pressure, ask which side each number comes from. The complete way to state it gives both pairs. The SP 1800 D delivers up to 73 m³/hr at up to 62 bar on the rod side, or up to 42 m³/hr at up to 112 bar on the piston side. You get one or the other on a given day, so buy for the harder of the two jobs you expect to do.

Rod sidePiston side
Oil presses onThe ring around the rodThe full piston face
OutputHigherLower
Pressure on concreteLowerHigher
Strokes per minuteMoreFewer
Best forLarge pours, short linesHeight, distance, stiff mixes

Figures are from Schwing Stetter India's technical specifications and are maximum theoretical values. See each model on the stationary pumps page.

Not sure which set-up your job needs?

Tell us the height, the line length and the volume per pour.

Request a quotation

See the Schwing stationary pumps

in Blog
Pan mixer or twin-shaft mixer: what is inside your batching plant, and why it matters
Message usClose
Schwing Stetter PhilippinesChat with us on Messenger

Hello. Tell us which equipment or parts you need, and where your project is. We will reply on Messenger.

Opens Messenger with your message ready to send.