Every gearbox on a batching plant has its own oil, its own quantity and its own change interval, and the first change comes much earlier than the rest. This guide sets them out for the CP 18, with the figures for the larger plants alongside.
Why the first change comes early
The manufacturer's lubricant list gives every gearbox a first service far ahead of its normal interval: 100 hours for the gearboxes and 50 hours for the compressor. That first change clears the run-in wear out of a new gearbox. Skipping it leaves that material circulating in the oil for the next thousand hours.
CP 18: oils, quantities and intervals
| Where | Oil | Quantity | First change | Then every |
|---|---|---|---|---|
| Pan mixer gearbox | Gear oil SP 220 | 7 liters | 100 hours | 1,000 hours |
| Skip gearbox | Gear oil SP 220 | 4 liters | 100 hours | 2,000 hours |
| Cement screw conveyor gearbox | Gear oil VG 220 | 2 liters | 100 hours | 2,000 hours |
| Air compressor | Compressor oil, 150 grade | 0.5 liter | 50 hours | 250 hours |
| Lubricator in the air service unit | System oil, 32 grade | 0.5 liter | Not applicable | Top up as needed |
| Skip rope | Cardium compound | As required | Not applicable | At the 200-hour service |
The service schedule asks for the compressor oil at the 200-hour service, which is inside the 250 hours on the lubricant list. Doing it at 200 hours keeps one routine.
Larger plants
Quantities grow with the plant, and the pan mixers on the CP 30 and M1 take a different oil from the CP 18.
| Where | Oil | CP 30 | M1 | Interval |
|---|---|---|---|---|
| Pan mixer gearbox | Engine oil 20W40, MIL-L-2104C | 19 liters | 38 liters | 1,000 hours |
| Skip gearbox | Gear oil VG 220 | 4.6 liters | 25 liters | 2,000 hours |
| Scraper gearbox | Gear oil VG 220 | 6.2 liters | Not fitted | 2,000 hours |
| Cement screw conveyor gearbox | Gear oil VG 220 | 2 liters | 2.5 liters | 2,000 hours |
| Air compressor | Compressor oil, 150 grade | 0.5 liter | 1 liter | 250 hours |
On a twin-shaft mixer, the worm gear reducers take 70 liters of gear oil VG 460. The first change is at 500 hours, then every 2,000 hours.
Grease points
Greasing is a 50-hour job. These are the points the manufacturer lists:
- Pan mixer gate bearings and mixer loading gate journal bearings
- Mixer arm bearing journals
- Aggregate gate journals
- Discharge gate cylinder mountings
- Skip slack-rope adjuster bushings and the skip rope mounting journal
- Screw conveyor hanger bearings
- On a plant with a scraper, at 100 hours: the rotation flange, shaft bushings and rollers
On a twin-shaft mixer, EP 2 grease is used for all bearings, seals and grease nipples. The central lubrication feeds the four shaft seals while the mixer runs, and after the mixer has been cleaned the shaft seals are greased by hand.
Getting it right
- Use the grade on the list. The CP 18 pan mixer and the CP 30 pan mixer take different oils. Do not carry one drum across both.
- Check levels between changes. The mixer gearbox oil level is a daily check. The skip and screw conveyor gearbox levels are checked every 50 hours.
- Drain the compressor daily. Condensate comes out of the tank and the water separator every day.
- Wipe a grease nipple before greasing it, so the grit on it does not go into the bearing.
The full service routine is in batching plant maintenance by the hour meter.
Not sure which oil your plant takes?
Tell us the plant model and we will confirm the grade, the quantity and the interval.