Skip to Content

Batching plant lubrication: what goes where

November 19, 2026 by
Schwing Stetter Philippines

Every gearbox on a batching plant has its own oil, its own quantity and its own change interval, and the first change comes much earlier than the rest. This guide sets them out for the CP 18, with the figures for the larger plants alongside.

Who this is for: owners, plant managers and trained maintenance teams. Use it to plan the work and to check that it is done. The intervals and points come from Schwing Stetter India's general documents, so check them against the manual for your model, which governs. The work itself is done by trained personnel with the machine isolated.
100 hfirst oil change on the mixer, skip and screw conveyor gearboxes
1,000 hmixer gearbox oil change after that
2,000 hskip and screw conveyor gearbox oil change after that
50 hfirst compressor oil change

Why the first change comes early

The manufacturer's lubricant list gives every gearbox a first service far ahead of its normal interval: 100 hours for the gearboxes and 50 hours for the compressor. That first change clears the run-in wear out of a new gearbox. Skipping it leaves that material circulating in the oil for the next thousand hours.

12345
Where the oil goes on a compact plant: 1 mixer gearbox, 2 skip gearbox, 3 skip rope, 4 compressor, 5 cement screw conveyor gearbox. The drawing is a schematic, not a scale view of one model.

CP 18: oils, quantities and intervals

WhereOilQuantityFirst changeThen every
Pan mixer gearboxGear oil SP 2207 liters100 hours1,000 hours
Skip gearboxGear oil SP 2204 liters100 hours2,000 hours
Cement screw conveyor gearboxGear oil VG 2202 liters100 hours2,000 hours
Air compressorCompressor oil, 150 grade0.5 liter50 hours250 hours
Lubricator in the air service unitSystem oil, 32 grade0.5 literNot applicableTop up as needed
Skip ropeCardium compoundAs requiredNot applicableAt the 200-hour service

The service schedule asks for the compressor oil at the 200-hour service, which is inside the 250 hours on the lubricant list. Doing it at 200 hours keeps one routine.

Larger plants

Quantities grow with the plant, and the pan mixers on the CP 30 and M1 take a different oil from the CP 18.

WhereOilCP 30M1Interval
Pan mixer gearboxEngine oil 20W40, MIL-L-2104C19 liters38 liters1,000 hours
Skip gearboxGear oil VG 2204.6 liters25 liters2,000 hours
Scraper gearboxGear oil VG 2206.2 litersNot fitted2,000 hours
Cement screw conveyor gearboxGear oil VG 2202 liters2.5 liters2,000 hours
Air compressorCompressor oil, 150 grade0.5 liter1 liter250 hours

On a twin-shaft mixer, the worm gear reducers take 70 liters of gear oil VG 460. The first change is at 500 hours, then every 2,000 hours.

Grease points

Greasing is a 50-hour job. These are the points the manufacturer lists:

  • Pan mixer gate bearings and mixer loading gate journal bearings
  • Mixer arm bearing journals
  • Aggregate gate journals
  • Discharge gate cylinder mountings
  • Skip slack-rope adjuster bushings and the skip rope mounting journal
  • Screw conveyor hanger bearings
  • On a plant with a scraper, at 100 hours: the rotation flange, shaft bushings and rollers

On a twin-shaft mixer, EP 2 grease is used for all bearings, seals and grease nipples. The central lubrication feeds the four shaft seals while the mixer runs, and after the mixer has been cleaned the shaft seals are greased by hand.

Getting it right

  • Use the grade on the list. The CP 18 pan mixer and the CP 30 pan mixer take different oils. Do not carry one drum across both.
  • Check levels between changes. The mixer gearbox oil level is a daily check. The skip and screw conveyor gearbox levels are checked every 50 hours.
  • Drain the compressor daily. Condensate comes out of the tank and the water separator every day.
  • Wipe a grease nipple before greasing it, so the grit on it does not go into the bearing.
The trade names on the manufacturer's list are Indian brands. Ask us for the equivalent grade available here before substituting, and treat the lubricant chart supplied with your own plant as final.

The full service routine is in batching plant maintenance by the hour meter.

Not sure which oil your plant takes?

Tell us the plant model and we will confirm the grade, the quantity and the interval.

Ask about lubricants
Batching plant maintenance by the hour meter
Message usClose
Schwing Stetter PhilippinesChat with us on Messenger

Hello. Tell us which equipment or parts you need, and where your project is. We will reply on Messenger.

Opens Messenger with your message ready to send.