Most batching plant breakdowns give a week or two of warning: a rope starting to fray, a seal weeping slurry, a load cell cable rubbing on steel. A weekly walk-around with a written list is how those get caught on a quiet day and not in the middle of a pour. This is the weekly check Schwing Stetter gives plant crews.

Who this is for: owners, plant managers and trained maintenance teams. Use it to plan the work and to check that it is done. The intervals and points come from Schwing Stetter India's general documents, so check them against the manual for your model, which governs. The work itself is done by trained personnel with the machine isolated.
51points on the weekly check
Weeklyone person, one walk-around, one signed sheet
OK / Not OKevery point gets a mark, not a memory
Remarkswhat was found, so the next check can compare

How to use it

  1. Do it with the plant stopped and locked out wherever the check means reaching into the skip, the mixer or the gates.
  2. Mark every line. A blank line is a point that was not checked.
  3. Write what you found in the remarks, not only that it failed.
  4. Keep the sheets. A rope or a wear plate that reads "fair" three weeks running is telling you when to order the part.
5Oil levels33Mechanical13Electrical
The manufacturer's weekly check has 51 points. Most of them are mechanical, and most take a look and a hand on the part, not a tool.

Oil levels

CheckOKNot OKRemarks
Mixer gearbox
Skip gearbox
Screw conveyor gearbox
Compressor
Air service unit lubricator

Mechanical

Skip

CheckOKNot OKRemarks
Condition of the skip rope
Condition of the skip rollers
Movement of the skip
Lubrication of the skip rope

Mixer

CheckOKNot OKRemarks
Condition of the double horn shovel and stripper
Mixing tool gaps adjusted
Condition of the wearing packing
Condition of the wear plate
Condition of the bottom tiles
Condition of the sealing ledge
Opening and closing of the mixer discharge gate
Manual operation of the mixer gate
Greasing of the mixer

Scraper, where fitted

CheckOKNot OKRemarks
Condition of the scraper brake
Scraper boom swing operation

Weighing

CheckOKNot OKRemarks
Aggregate weigher alignment
Cement weigher alignment
Condition of the load cell transport locks

Air and water

CheckOKNot OKRemarks
Any leak in the pneumatic line
Any leak in the water line
Condition of the 3/2 valve
Condition of the 5/2 solenoid valves
Air pressure setting at the regulator
Water drained from the moisture separator
Condition of the pneumatic cylinders
Condition of the pneumatic hoses and fittings
Compressor pressure cut-in and cut-out

Around the plant

CheckOKNot OKRemarks
Condition of the grease nipples
Lubrication of the screw conveyor hanger bearing
Condition of the rubber hoses
Condition of the discharge chute
Condition of the batching gates
Condition of the silo top filter

Electrical

CheckOKNot OKRemarks
Proximity sensors working
Safety and emergency functions working
Control panel clean
Condition of the load cells
Condition of the load cell cables
Control panel fan clean
Parameter settings
Condition of the printer
Condition of the moisture meter
Silo level indicator working
Silo filter vibrator working
Silo injection nozzle working
Condition of the grounding
A point marked "Not OK" on a safety item, such as an emergency stop, a limit switch or the grounding, stops the plant until it is put right. Never bypass a safety device to keep batching.

What the weekly check does not replace

  • The daily checks: input voltage, gearbox and compressor oil, condensate, safety switches and the clean-out of the mixer.
  • Calibration of every weigher, at least once a month.
  • The hour-based services at 50, 100, 200, 1,000 and 2,000 hours.

Those are set out in batching plant maintenance by the hour meter.

This checklist follows the manufacturer's standard weekly sheet. Not every line applies to every plant: a CP 18 has no scraper, for example. Strike out what your plant does not have.

Found something on your walk-around?

Tell us the plant model and what you found, and we will tell you what it needs.

Ask about parts and service
Batching plant lubrication: what goes where
Message usClose
Schwing Stetter PhilippinesChat with us on Messenger

Hello. Tell us which equipment or parts you need, and where your project is. We will reply on Messenger.

Opens Messenger with your message ready to send.